Before assembly prepare all necessary new spare parts, laying and consolidations, and also the following tools and devices:
– standard tool kit; – a dynamometer key with a head 1/2; – device for installation of piston rings; – a mandrel for sinking of piston rings; – pieces of rubber or plastic hoses for clothing on rod cover bolts; – plastic calibration wire of "Plastigauge"; – set of probes; – file; – fresh oil for the engine; – assembly lubricant or lubricant on the basis of a molybdenum disulfide; – sealant; – a compound for fixing of threaded connections.
To save time and labor costs, assembly is recommended to be carried out in the following order. – piston rings (see subsection 3.1.2.16); – a bent shaft and radical bearings (see subsection 3.1.2.17); – pistons assembled with rods (see subsection 3.1.2.19); – a back epiploon of the crankshaft (see subsection 3.1.2.18); – a head of cylinders and pushers (see subsection 3.1.1.11 and subsection 3.1.1.9); – cam-shafts (see subsection 3.1.1.9); – the oil pump (see subsection 3.1.1.13); – a gear belt and gear wheels of a belt, a cover of a gear belt (see subsection 3.1.1.6); – an oil receiver (see subsection 3.1.1.12); – the oil pallet see subsection 3.1.1.12); – the soaking-up and final collectors (see subsection 3.1.1.4 and subsection 3.1.1.5); – a cover of a head of the block of cylinders (see subsection 3.1.1.3); – a flywheel (a drive plate of the hydrotransformer) (see subsection 3.1.1.14); |